The 800' track expansion loop around the field was substantially completed Aug 22, 2016.
Dan, Ken, Mike, Hans, Bob, TomS, Doug, and Davef...
Installing the diamond crossover was tricky; some...
Doug designed and installed the facia and rockery on the...
the train ran surprisingly well with no arter-ballasting...
P 20160816 193418
On Tues Aug 16 Dan, Tom, Ken and Dave added the horse...
P 20160816 191419
P 20160816 193256
P 20160816 193333
P 20160816 200556
P 20160816 200813
P 20160816 200820
P 20160816 191424
P 20160822 095432
P 20160822 095504
P 20160822 104434 LL
P 20160822 112047 LL
P 20160822 112146
P 20160822 112245
P 20160822 123937 LL
P 20160822 141655 LL
P 20160822 141716 LL
P 20160822 141759
P 20160822 145004
P 20160825 153214
P 20160825 153232
P 20160825 153304
P1010443
P1010444
P1010445
P1010447
P 20161019 130512
32
Images | Create
web photo albums
with
Jalbum
|
Chameleon
skin |
Help