Years: 2011 to present
- Was Plutonic Power; merged with Magma Energy 2011
- Activity: run-of-river hydroelectric projects on the Toba and Bute inlets; with future plans for Eldred North, Eldred South, Powell and Chusan creeks
- Main impact in the Powell River area is the power line from Toba to Saltery Bay, which was built 2008 - 2010, with power flowing through Saltery Bay August 2010
- possible future project: the Freda Creek proposal (peak story here)
- Links:
- Comments: